12″
Louisiana has no meaningful frost depth. Footings still go at least 12″ below grade — that minimum is about solid bearing, not frost.
Reference: 2021 Louisiana Residential Code (Louisiana State Uniform Construction Code, effective January 1, 2023), Section R403.1.4 minimum footing depth with local frost line entries in Table R301.2 (2021 edition). Counties amend their codes — confirm the exact figure with your local building department before you pour.
Depth pre-filled to the 12″ code minimum.
| Bag size | Exact | Buy (with spare) |
|---|
The buy column adds a 10% spare margin and rounds up. Running out mid-pour is the one mistake you can't fix.
Subtropical winters keep Louisiana soil from freezing; even in the northern parishes frost penetrates at most an inch or two during brief cold snaps. Footing depth here is about bearing on stable soil, not frost protection.
The depth tracks how much freezing a winter actually delivers. NOAA's Air Freezing Index keeps a running score of how far and how long air temperatures sit below freezing; deeper scores mean deeper frost, and building codes translate that climate record into the footing depth above. Water expands about 9% when it freezes — when that happens under a footing, the ground lifts it. That's frost heave, and it cracks foundations, tilts fence lines, and pops deck piers. Getting below the frost line puts your concrete where the ground never freezes.
The ground effectively does not freeze in Louisiana, so the governing rule is the code minimum of 12 inches of footing embedment below undisturbed grade; jurisdictions like Baton Rouge and Shreveport list 12 inches as their frost line. New Orleans is a special case where soft soils, not frost, drive foundation design and pile support is typically required.
Treat this page as the starting number, not the permit. County and city amendments are where the real precision lives, and inspectors enforce the local figure — one phone call to the building department settles it.
Effectively zero — the ground doesn't freeze deep enough to move a footing. The code minimum of 12″ below grade still applies, for bearing rather than frost.
The ⅓ rule governs: bury one third of the above-grade height, never less than 24″. A 6 ft fence wants 24″ in the ground. The post depth calculator does it in one step.
At least 12″ below grade on undisturbed soil. Size the diameter with the deck footing calculator.